Instructions for using ground drills

2024-02-06
earth auger

earth auger , also known as tree planting planting machine, or Ground drill, is a professional tool used for drilling holes and a modern tree planting equipment.

Ground drills can be widely used in agricultural activities such as afforestation, planting fruit forests, opening fences, and fertilizing fruit trees in autumn. These operations can be achieved through the use of ground drills, which can not only improve efficiency and accuracy, but also save labor costs and achieve a win-win situation between efficiency and labor. In addition, ground drills can also be used for adjusting farmland soil, which can manage it more evenly, thereby improving the quality and yield of crop growth. Tree planting and digging machines are essential mechanical products in modern planting industry, and the follow-up of mechanization has led to a wider application of ground drills. Whether it is a small handheld gasoline excavator or a handcart excavator, the usage rate is also increasing. With its powerful functions, it is widely used in ground drilling and drilling in various industries.

The structural composition of ground drills

A ground drill is a modern tree planting equipment that can quickly and efficiently dig holes suitable for planting trees. This type of equipment can adapt to different terrains and soil conditions, ensuring the quality and efficiency of ground drill. Do you know what constitutes a ground drill?

  1. Rack: As the main body of the entire equipment, it provides support and connections for other parts.
  2. Transmission mechanism: usually including transmission shaft, gearbox, etc., connected by the power output interface on the engine to drill the central control shaft and drive the drill bit to rotate.
  3. Drill bit: used to drill holes in soil and dig holes suitable for planting trees.
earth auger

Precautions for refueling with ground drills

When using a ground drill, it has the advantages of high digging efficiency, high engine horsepower, and saving labor costs. When using a ground drill, gasoline needs to be added, so what kind of gasoline needs to be added and how to refuel need to be clearly defined.

1.What kind of oil is good for adding to the ground drill

Ground drills usually require the addition of various types of oil to ensure their normal operation. The following are some common types of oil products:

  • Gasoline: Most drills are gasoline engines, so gasoline needs to be added when using a gasoline engine. Choosing the appropriate gasoline specification is crucial to ensure optimal performance in the drive system.
  • Oil: Our drill uses a two-stroke gasoline drill. The ratio of gasoline to engine oil is 40:1, and a certain amount of engine oil needs to be added during use to ensure the normal operation of the machine.
  • Hydraulic oil: used for lubrication and force transmission in hydraulic systems of underground drills. Choosing the appropriate hydraulic oil is crucial for ensuring the normal operation and extending the service life of ground drills.

When selecting oil products, it is necessary to consider the model, design requirements, and usage conditions of the drill. It is recommended to refer to the manufacturer's recommendations and operating manuals to ensure that the correct oil products are selected and used correctly.

2.How to add gasoline oil to the ground drill

  • Preparation work
  • Firstly, it is necessary to park the excavator on a flat surface and turn off the engine. Secondly, it is necessary to prepare the correct type of oil and filling tools.
  • Find the refueling port
  • The refueling port of the excavator is mostly located under the hood and can be found through the indicator signs on the hood. After finding the fuel cap, you need to loosen it first.
  • Add oil
  • Pour the engine oil into the filler neck, being careful not to over pour or overflow the oil. Generally speaking, it is sufficient to fill above the indicated line, but correct filling should also be carried out according to specific vehicle models and oil requirements. After filling, gently turn the fuel pipe and pour all the remaining oil into the engine of the excavator.
  • Check engine oil
  • After adding oil, it is necessary to check whether the oil level is within the standard range. If it is too high or too low, it may have adverse effects on the engine operation of the excavator.

3.Precautions for adding oil to ground drills

  • Be careful to add the correct type of engine oil when refueling.
  • When refueling, avoid oil entering areas that should not be entered.
  • Do not add too much or too little engine oil, and add it according to the specified amount.
  • During the oil change cycle, it is necessary to regularly check the quality of the oil.

In short, adding oil according to the correct steps can ensure that the drilling engine operates at its optimal state and extend its service life.

earth auger

Rebound repair of ground drills

When using a ground drill, having a basic understanding of the causes of resistance and rebound can help you reduce or eliminate panic, better cope, and avoid accidents.

During the drilling operation of the ground drill, safety precautions should be taken. When the drill blade or blade suddenly touches a hard object, the machine body may rebound, causing the operator to suddenly lose their center of gravity and lose control of the ground drill. When the geological layer is hard, the power is far less than the resistance, and the operator cannot hold the handle of the support with both hands, causing them to lose control of the ground drill. Both types of resistance and rebound force can cause serious personal injury to you. When such phenomena occur, do not panic and handle them calmly. Firstly, when the ignition switch is turned off, it should be turned off and kept away from the body. Secondly, if there is no time to turn off the ignition switch, please stay away from the rotating engine and hold onto the handle of the bracket when the engine speed drops and the engine is stationary. Slowly refuel until the ground drill is working properly.

Prohibition of using ground drills

  • Ground drill should not be used on soil that is too wet. For example, if the soil has just rained, ground drill cannot be used directly. The effect of digging pits is not obvious and it can also cause damage to the ground drill .
  • If there is only gravel, a pit ground drill can be used, but it is not recommended to use a pit ground drill if there are large stones.
  • In areas with a large number of tree roots, some small roots are not a problem, but some large roots need to be cut off before use to avoid affecting the use of the ground drill .
  • In areas with construction waste, in addition to some concrete fragments, there may also be items such as steel bars. Therefore, when using a ground drill , attention should be paid. In areas with excessive construction waste, it is not recommended to use a ground drill . If there is relatively small construction waste, it can be used.

 

Request For Quotations

    Details of Order Requirements* :


    Get the latest updates!

      map-marker